posted Jan 11, 2018, 10:40 AM by Greg Papuga
- Congratulations to Saint who was married on December
10 th!
- 9 bath room doors between the toilet room and dressing
area of large bath were replaced.
- Weather stripping sweeps were installed to the bottom of
each unit door.
- Maintenance re-painted the walkway area between the
office and elevator.
- The handrails were secured in problem areas- such as in
front of 103, by an outside concrete contractor.
- New 42inch LG televisions were installed to units 101, 102,
103. This project will continue until all 22 units have been
upgraded with the larger tv. The smaller 32” set was
moved to the bedroom.
- New pots/pans sets are being placed in units.
- All units have a new coffee maker. It makes up to 12 cups
at a time and eliminates the glass carafe.
- We now have 2 full size high chairs and 2 pack and plays
available for guests to borrow.
|
|